Slab pre-pour inspection in Aintree

Before the concrete truck arrives, the steel, pods and beam sizes on your Aintree slab are checked against the engineer's design.

  • Steel exposed and pods fixed, before the concrete
  • About 1 hour on site
  • Report within 24 hours
Get a quoteSend us your details and we will send a price

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage2 of 7
When to bookSteel exposed and pods fixed, before the concrete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Aintree slab pre-pour inspection

  • Slab class and layout checked against the engineer's design and the soil report
  • Edge beam and internal beam depths and widths
  • Reinforcement size, spacing, laps and trench mesh
  • Bar chairs, cover and support so steel does not sit on the ground
  • Waffle pods, void formers and pod spacing
  • Vapour barrier coverage, laps and tape at penetrations
  • Plumbing and electrical penetrations and sleeves
  • Set-downs for wet areas, garage, porch and alfresco
  • Termite management components installed before the pour
  • Formwork alignment, level and set-out against the plans
  • Stormwater pipe cover and pit positions where visible
  • Site cut, fill and pier holes where visible
  • Hot water service and meter box slab extensions formed
  • Trench cleanliness and debris before the pour
Why it matters here

Slab pre-pour inspections on Aintree builds

Our Aintree slab jobs have shown edge beams formed to the wrong depth, mesh laid directly on the ground, vapour barrier pulled tight over the steel and termite collars missing from the formwork. Each one is easy to fix now and impossible to fix after the pour.

What we find at this stage in Aintree

  • Edge beams formed at the wrong depth
  • Mesh resting on the ground instead of chairs
  • Vapour barrier draped over the steel
  • Termite collars not fitted to formwork
  • Insufficient seating for the shelter cover
  • Concrete recess not installed
Adjust the vapour barrier, recorded during a slab pre-pour inspection in Aintree
The vapour barrier was covered by the steel beams, which stops it from working properly
Deformed mesh, recorded during a slab pre-pour inspection in Aintree
The mesh was deformed which means the concrete cover might be compromised
Bar chair additional needed, recorded during a slab pre-pour inspection in Aintree
The inspector noted that additional bar chairs are needed to ensure the concrete cover allowance is met
Sample findings

Sample defects found during our slab pre-pour inspections in Aintree

Annotated findings from Slab pre-pour inspections.

Installed partially, recorded during a slab pre-pour inspection in Aintree
The item was installed partially and requires completion before the final inspection
Vapour barriers sections missing, recorded during a slab pre-pour inspection in Aintree
Vapour barriers were missing at ground level around the perimeter of the concrete slab
Loose or damages, recorded during a slab pre-pour inspection in Aintree
The pest inspection found some parts of the physical termite barrier are aged or installed improperly
Trimming required, recorded during a slab pre-pour inspection in Aintree
The shower recess is too large and will prevent the plaster from sitting flat

The other stages of a Aintree build

  1. Bored piers inspection in Aintree1Bored piersPiers bored and cages placed, before the concrete pour
  2. Frame inspection in Aintree3FrameFrame and trusses up, with the roof sheeted, before cladding
  3. Lock-up (pre-plaster) inspection in Aintree4Lock-up (pre-plaster)Roof, windows and doors installed, before plasterboard
  4. Fixing inspection in Aintree5FixingDoors, joinery and mouldings fitted, prior to painting
  5. Waterproofing inspection in Aintree6WaterproofingMembrane on and cured, before the tiler starts work
  6. Pre-handover (PCI) inspection in Aintree7Pre-handover (PCI)Ready for your final check before handover.

All construction stage inspections in Aintree →

Guides

Construction stage guides for Aintree

All guides →

Book a slab pre-pour inspection in Aintree

Instant online pricing for Aintree, or contact the booking team.

FAQ

Slab pre-pour inspections in Aintree: common questions

What is the most serious slab finding you see in Aintree?

Wrong beam depth. One Aintree slab had an edge beam formed at the wrong depth because the formwork was not braced correctly.

Why does mesh on the ground matter?

The steel must be off the ground to protect it from corrosion and ensure correct cover. If it sits on dirt, the concrete cannot protect it.

Is the vapour barrier essential?

Yes. The membrane must be laid under the steel framing and taped to the joints to stop moisture.

Is the concrete pour on hold?

Fix before you buy. Our team checks concrete work on the spot so the builder can fix defects immediately.

What are the regulations?

A residential slab and footing specification, the engineer's design, and the soil report for your specific block.

Is a soil report required?

It helps. The concrete slab's rating determines how much steel is needed and the depth of the beams.